How We Deliver Digital Construction & Simulation
4D Construction Simulation
Construction sequences are modelled in four dimensions — geometry, time, resource, and logic — against verified
3D models and georeferenced site conditions. Every phase of your construction programme is simulated before mobilisation,
identifying sequencing conflicts, access constraints, and critical path risks that traditional 2D programme reviews consistently miss.
Your project team rehearses the construction sequence digitally before a single crew is deployed on site.
Lift Planning & Heavy Lift Simulation
Complex crane lifts, module installations, and heavy lift operations are simulated in full 3D against accurate facility geometry,
structural clearances, and site constraints — verifying lift radii, hook heights, rigging configurations,
and exclusion zones before the lift crew arrives. Every lift plan is produced from verified spatial data,
eliminating the dimensional assumptions that turn planned lifts into field incidents and unplanned delays.
Temporary Works & Access Simulation
Scaffolding schemes, temporary structures, access platforms, and construction haul routes are modelled and
simulated within the verified site environment — confirming that temporary works fit within available space,
meet load and clearance requirements, and do not conflict with live operations, permanent structures,
or concurrent construction activities.
Installation & Constructability Validation
Every major installation — pipe spools, structural modules, mechanical packages, and subsea components — is virtually installed within the coordinated 3D model before fabrication is complete. Constructability reviews identify fit issues, access restrictions, and tool clearance conflicts at the design stage, where resolution costs a fraction of the equivalent field modification.